Development of transport networks between districts xiii and xiv, budapest
Providing a connection between the 13rd and 14th Districts of Budapest has been on agenda for many years. The project’s mission is to lift the fragmenting effect of railway lines no. 70&71 along with preparing the surrounding infrastructural network to allow and enable a better distribution of traffic between the affected neighbourhoods, including traditional and alternative means of transport, as well as creating more efficient transfer options.
A new tram line is introduced along with an extensive upgrade to the cycle network of the area.The project also covers the improvement of open spaces of junctions in the project area.
Parameters
Budapest, HU
Location
Year
TBD
Design phase
Status
Length of designed/renovated tram line
2 km
Length of designed/renovated roads
7,5 km
Length of designed/renovated cycle route
5 km
No. of designed bridges
5
Length of longest bridge
160 m
services
Design coordination from conceptual to construction design phase, traffic & public transport analysis, scenario analysis, urban development evaluation, road & infrastructure design, bridge & structural design, cost-benefit analysis, environmental impact assessment, utility & drainage design, geotechnical design.
Awards
TEKLA BIM Awards Local Ist place, Infrastructural Projects category