Structures under construction

 


   
Gyula, Fehér-Körös bridge reinforcement and deck replacement

Gyula, Fehér-Körös bridge reinforcement and deck replacement

Year of design:   2007
Client(s):   Magyar Közút Állami Közútkezelő Fejlesztő Műszaki és Információs KHT.
Structure:   changing of concrete deck to orthotropic steel deck
Span(s):   21,00 m+42,00 m+21,00 m (84,00 m)
Width:   5,90 m (0,45 m+5,00 m+0,45 m)
Structural height:   0,33-0,42 m (ortotróp pályalemez)
Details >>    
   
   

M0-M1 highway junction "M" branch overpass - Steel bridge above the M1 highway

Year of design:   2007
Client(s):   Dautche General Kft.
Structure:   steel box-girder with orthotropic deck
Span(s):   44,11 m+41,17 m
Width:   13,23 m (1,615 m+10,00 m+1,615 m)
Structural height:   2,60 m
Website of the project   www.topark.eu
Details >>    
M0-M1 highway junction "M" branch overpass - Steel bridge above the M1 highway
   
   
DBR (South-Buda – Rákospalota) metro line 4 – metro station called "Kelenföldi railway station" (general design)

DBR metro line 4 – metro station called "Kelenföldi railway station" (general design)

Year of design:   2007 - 2009
Client(s):   Hídépítő Zrt.
Contractor(s):   Hídépítő Zrt.
Structure:   Cut-and-cover structure built by means of the milanese method, supporting 28 tracks of MÁV as if it would be a railway bridge carried out with monolitic reinforced concrete roof-slab; mined tunnel for reversing the trains is connected to the cut-&-cover structure.
Details >>    
   
   

DBR (South-Buda – Rákospalota) metro line 4 – "Saint Gellért square" station – structural design

Year of design:   2007 - 2008
Client(s):   UVATERV Zrt.
Contractor(s):   Hídépítő Zrt.
Structure:   Cut-and-cover structure built by means of the milanese method, with monolitic reinforced concrete slabs.
Details >>    
DBR (South-Buda – Rákospalota) metro line 4 – "Saint Gellért square" station – structural design
   
   
North-Pest_Sewage_Plant

North-Pest Sewage Plant

Year of design:   2008 - 2009
Client(s):   Újlak Mérnökiroda Kft.
Year of construction:   2008 - 2009
Contractor(s):   ALTERRA Építőipari Kft., PASSAVANT-ROEDIGER Gmbh.
Details >>