M6 highway, "M0-Érd top hill" section, M6/147. sz. overpass

 
   
M6 highway, "M0-Érd top hill" section, M6/147. sz. overpass over the MÁV Bp.-Pusztaszabolcs railway line
Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt., MAHÍD2000 Zrt., MCE Nyíregyháza Kft.
Structure:   steel-concrete composite girders
Span(s):   left path: 30,58 m+50,61 m+30,57 m (111,76 m)
right path: 28,88 m+47,89 m+28,87 m (106,64 m)
Width:   left path: 17,88 m (1,565 m+15,75 m+0,565 m)
right path: 15,80 m (0,565 m+13,67 m+1,565 m)
Structural height:   left path: 2,59 m right path: 2,47 m
   


 
 
 
 
 

<< Back