Pedestrian overpass at Körmend

 
   
Year of design:   2011 - 2013
Client(s):   GYSEV Zrt.
Year of construction:   2013 - 2014
Contractor(s):   KÖZGÉP Építő- és Fémszerkezetgyártó Zrt.
Structure:   continuous two-span girder, a continuous “langer” static system, where two spans with different length werebuilt with arches,with a concrete slab inside the “I section “ steel main girders
Span(s):   27.00 – 21.00 – 39.00 m
Structural height:   0.61 m
Width of the superstructure:   3.26 m
Station   www2.gysev.hu
www2.gysev.hu
   