About us
Railway design
Metro stations
References
Steel and composite bridge design
Tunnels
Actualities
Concrete bridge design
Retaining walls
Partners
Bridge reconstruction
Water treatment
Links
Design of buildings
Underpass
Sitemap
Civil engineering structures
Technology
Contact
Bridge inspections
Road design, traffic management
REFERENCES
(pps, 4.4 Mb)
DBR (South-Buda – Rákospalota) metro line 4 – "Saint Gellért square" station – structural design
Year of design:
2007 - 2008
Client(s):
UVATERV Zrt.
Contractor(s):
Hídépítő Zrt.
Structure:
Cut-and-cover structure built by means of the milanese method, with monolitic reinforced concrete slabs.
Connecting materials
Budapest Subway line 4. - Design of the Szent Gellért Square Station - Hungarian Tunnelbuilder Society BMGE, 2008, Jan. 18.
(
Download: PDF 5,6 MB
)
Further Links
Subway line 4. - Design of the Szent Gellért Square Station - András Németh's blog
<< Back