Constructed composit bridges

 


   
M6-M0 highway junction, M0/142/K. sz. overpass over the Angeli street

M6-M0 highway junction, M0/142/K. sz. overpass over the Angeli street

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt., MAHÍD2000 Zrt., Gyárépszer Kft., Molnár Zrt., Pilontechnika 52 Kft.
Structure:   steel-concrete composite girders
Span(s):   30,60 m +40,00 m+30,60 m (101,20 m)
Width:   13,88 m (1,315 m+11,00 m+1,565 m)
Structural height:   2,47 m
Details >>    
   
   

M6 highway, "M0-Érd top hill" section, M6/147. sz. overpass

Year of design:   2005
Client(s):   CÉH Zrt.
Year of construction:   2007 - 2008
Contractor(s):   Vegyépszer Zrt., MAHÍD2000 Zrt., MCE Nyíregyháza Kft.
Structure:   steel-concrete composite girders
Span(s):   left path: 30,58 m+50,61 m+30,57 m (111,76 m)
right path: 28,88 m+47,89 m+28,87 m (106,64 m)
Width:   left path: 17,88 m (1,565 m+15,75 m+0,565 m)
right path: 15,80 m (0,565 m+13,67 m+1,565 m)
Structural height:   left path: 2,59 m right path: 2,47 m
Details >>    
M6 highway, "M0-Érd top hill" section, M6/147. sz. overpass over the MÁV Bp.-Pusztaszabolcs railway line
   
   
M30 highway "end junction" overpass

M30 highway "end junction" overpass

Year of design:   2004
Client(s):   CÉH Zrt.
Year of construction:   2004
Contractor(s):   Vegyépszer Zrt., MAHÍD2000 Zrt., GANZ Acélszerkezet Zrt.
Structure:   steel-concrete composite girders
Span(s):   38,00 m + 45,00 m + 45,00 m + 35,00 m (179,70 m)
Width:   2*12,83 m (0,565 m + 11,00 m + 0,565 m)
Structural height:   2,44 m
Details >>