Railway bridge over Marcal for the Boba delta-track at chainage 7+35

 
   
Year of design:   2006
Client(s):   MÁVTI Kft.
Year of construction:   2009 - 2010
Structure:   Underdecked steel girder bridge with ortotrope deck and ballasted track
Span(s):   28,70 m
Width:   7,40 m (1,00 m+5,40 m+1,00 m)
Structural height:   1,62 m
   


 
   
 

<< Back