About us
References
Actualities
Partners
Links
Sitemap
Contact
REFERENCES
(pps, 4.4 Mb)
Underpass no. B165. beneath the dirt road on main road No.21 at 16+565.05 km section
Year of design:
2013 - 2014
Year of construction:
2014 - 2015
Contractor(s):
SWIETELSKY - HE-DO Konzorcium
Structure:
twin girdered clamped composite bridge
Span(s):
49,55 m
Width:
47,55 m
Width of the superstructure:
7,13 m
Section
16+565,00