Underpass no. B165. beneath the dirt road on main road No.21 at 16+565.05 km section

 
   
Year of design:   2013 - 2014
Year of construction:   2014 - 2015
Contractor(s):   SWIETELSKY - HE-DO Konzorcium
Structure:   twin girdered clamped composite bridge
Span(s):   49,55 m
Width:   47,55 m
Width of the superstructure:   7,13 m
Section   16+565,00