Bypass bridge at Zalalövő on main road no.86. - B02 bridge

 
   
Year of design:   2011
Client(s):   NIF Zrt.
Year of construction:   2014
Contractor(s):   KÖZGÉP Építő- és Fémszerkezetgyártó Zrt.
Structure:   Two-span, continuous deck steel beam bridge with box cross-section, orthotropic steel slab.
Span(s):   2x80.00 m
Structural height:   2.95 m
Station   37+301,25 km sz.
   




<< Back