Bypass bridge at Zalalövő on main road no.86. - B01 bridge

 
   
Year of design:   2011
Client(s):   NIF Zrt.
Year of construction:   2014 - 2016
Contractor(s):   KÖZGÉP Építő- és Fémszerkezetgyártó Zrt.
Structure:   Eight-span, continuous deck steel beam bridge with box cross-section, orthotropic steel slab.
Span(s):   60.00 - 6x80.00 - 60.00 m
Structural height:   2.70 m
Station   34+061,25 km sz.
   



 
 
 
 

<< Back