About us
Railway design
Constructed concrete bridges
References
Steel and composite bridge design
Bridges under construction
Actualities
Concrete bridge design
Plans for the future
Partners
Bridge reconstruction
Railway bridges and -structures
Links
Design of buildings
Small span structures
Sitemap
Civil engineering structures
Contact
Bridge inspections
Road design, traffic management
REFERENCES
(pps, 4.4 Mb)
62. sz. főút M8 (Duna-híd) Székesfehérvár-Perkáta közötti elkerülő szakasz
Year of design:
2005 - 2010
Client(s):
Nemzeti Infrastruktúra Fejlesztő Zrt.
Year of construction:
2010 - 2012
Contractor(s):
PORR Építő Kft.
<< Back